SETTING OF IRON RODS FOR THE BASE ON THE 200 METRES LANE DRAIN
CONSTRUCTION OF THE BASE ON THE LANE DRAIN
WORK IN PROGRESS ON SITE AT BASHORUN 200 METRES LANE DRAIN
SETTING OF PALLETS FOR THE DRAIN WALL